On 2nd April 2006, all NET tram services were suspended while engineering work was carried out at a number of locations. Work included the removal of the footbridge at David Lane, which spanned the adjacent Network Rail tracks, and repair work on damaged overhead line equipment at Basford.
I didn't manage to get any pictures of the removal of the David Lane bridge, but here are some before and after shots at this location, along with some pictures of the work at Basford, which used men and machinery from Sheffield Supertram, and of the replacement bus service.
Pages: 1 [2]
NET's Unimog, with workers attending to overhead line underneath Bailey Street bridge near Basford
02/04/2006 • 002556
Nottingham City Transport's 681 on tram replacement duty at Wilkinson Street
02/04/2006 • 002557
Tram replacement buses at Wilkinson Street. The tram stop is behind the buses
02/04/2006 • 002558
NCT's 683 on a tram replacement duty
02/04/2006 • 002559
Pages: 1 [2]
Page generated in ≈ 0.0004 seconds