Line | Location | Opening date | number of platforms |
---|---|---|---|
Green | surface | 31st March 2002 | 1 |
South Hylton is the terminus of the Sunderland extension, opened in 2002. The station serves a residential area. There is a single platform, at the end of an otherwise double-track branch; the platform however is long enough for two trains, and is referred to as Platform 1 (southern, terminal end) and Platform 2 (northern end)
South Hylton's single platform, looking towards Sunderland. In the distance a train is just about to enter the single line section
06/07/2006 • 003030
South Hylton station platform, with 4076 arriving on a terminating service from the Airport
06/07/2006 • 003031
Search for more pictures taken at South Hylton
Services from this stop:
Page generated in ≈ 0.0146 seconds